Summary
Our coding agents share one to-do list and one list of problems they noticed, and both kept items open long after another session had shipped the fix, mostly deploy checks nobody went back to close.
When we checked the 400 most important open items on November 21 and 22, 89 of them were already done, so about one in five was work an agent would have redone or a person would have chased.
The fix is a revalidate-first rule: before touching any item, an agent checks git, the live deploy, our database ledger and the latest release notes, then reports one of five statuses.
A shared backlog for AI agents goes stale because the session that fixes an item is rarely the session that wrote it down. Our answer is to make every agent prove an item is still open before it works on it, and to close what it finds already done in the same pass.
We run Claude Code, Codex and other agents side by side on the ZeroTwo repos. Every session, whatever harness it runs in, writes the work it leaves unfinished to one shared to-do list and the problems it saw but left alone to a second list. Both lists are plain markdown files, edited only through a small script that locks the file so parallel sessions never overwrite each other.1
The lists did their first job well: nothing an agent left behind went unrecorded. They failed at the second job, which was telling us what was actually left. This post covers how that happened, three passes over the lists, the rule we use now, and today's counts. It does not show that the lists are under control, and the last section says why.
Items stayed open because the session that shipped a fix never saw the line
Each line on the to-do list names the repo, the thread it came from and one sentence of work, such as "deploy the API with this commit, then check that a live bot lists the new skills". The agent that wrote the line usually moved on before the deploy happened. A later session deployed the release for its own reasons, and the line stayed unchecked.
By November 11 the lists held 583 open to-dos and 622 open noticed items.2 When Reed asked an agent to work through the top of them, it found that a large share had already shipped. The causes were ordinary:
Nobody closes another session's line. Sessions closed what they had written themselves and rarely searched for lines someone else had added.
Deploy items outlive the deploy. A to-do that says "deploy X" is true until someone deploys, then false forever, and nothing flips it.
Noticed items get fixed in passing. An agent fixing one bug often fixes the neighbouring one an earlier session had only noted.
The agent instructions already said to close every item your work completed, whichever thread added it.1 That rule assumes the agent knows the item exists. With more than a thousand open lines, it usually did not.
Three passes found the same thing: a fifth of the top items were already done
The first pass, on November 11, sent thirteen worker agents through about 300 of the top items, each in its own worktree. That pass closed 171 items plus 4 deploy steps that were already live.2 The next two passes were larger, and their reports split the outcomes, which is what the table below shows.
On November 21 a workflow of 157 agents scored all 2,779 open items and took the 200 most important ones an agent could act on. On November 22 a workflow of 160 agents took the next 200. In both, a builder agent checked each item against the code and the live deploys before changing anything, and a reviewer agent checked every "already done" claim.3
| Nov 21: top 200 | Nov 22: next 200 | |
|---|---|---|
| Fixed in code | 47 | 70 |
| Already done | 53 | 36 |
| Not a problem | 6 | 5 |
| Waiting on Reed | 68 | 50 |
| New noticed items found | 42 | 57 |
Read across the rows, the two runs closed 117 items by fixing them and 89 because someone had already fixed them. Most of the already-done items on November 21 were deploy checks that a release live since November 18 had covered.3 Without the check first, those 89 items would have been 89 agents re-implementing a shipped change, or 89 questions to Reed about work that was finished.
The same runs also show the list's other habit: it refills. The two runs closed 142 noticed items and added 99 new ones, because reading old code closely turns up new problems.3
Every agent now proves an item is open before it works on it
The rule went into our agent notes on November 11 and into every burn-down since.2 Before working any item from either list, an agent runs four checks:
1. git: how far is dev ahead of main in each repo? Is the fix already merged?
2. deploy: which commit is live on each API service? Is the fix an ancestor of it?
3. ledger: do the release and database entries in our update history cover it?
4. release: does the latest release note already describe it?Then it reports exactly one status per item:
DONE: already shipped by someone else. Close it with the evidence.
FIXED: was still broken, now fixed and merged in this pass.
VERIFIED: was a check, the check passed.
NEEDS-REED: only a person can do it, such as a sign-in, a payment or a decision.
STALE: no longer true or no longer wanted.
Only then does the agent close lines, through the same locked script, citing the commit or deploy that proves the status. Each worker checks its own items first, so the expensive work, a builder and a reviewer per package, only starts on items that survived the check.
The five statuses matter more than the checks. "Waiting on Reed" was the largest single group in both runs, 68 and 50 items.3 Before the rule, those sat in the same undifferentiated list as finished work. Now they come out of each run as one list a person can answer in one sitting.
Clearing the list at scale found a second limit: the disk
The November 22 run had its own failure. About 40 minutes in, the Mac running it hit 0 GB free.4 All 47 builder agents had created their worktrees before the first merge ran, 57 at the peak, at about 3.2 GB for each API worktree and 1 GB for each web app worktree, about 100 GB in all.
We stopped the workflow, freed caches, resumed, and finished the reviewed packages by hand. The fix for next time is a cap on packages in flight and a disk check before starting. It is the same lesson as our worktree ledger: every agent's workspace is real disk and real state, and a run that creates them faster than it finishes them will fill up.
What remains unproved
The list is still growing. This morning the to-do list had 1,521 open items and the noticed list 1,366, up from 998 and 814 on November 17.5 Three passes closed hundreds of items, and the lists grew anyway. Revalidating first makes each pass honest. It does not make the lists shrink.
The November 11 split. That pass's notes record 171 closed items without splitting fixed from already done, so we only use the two later runs for the one-in-five figure.
Whether the rule sticks between passes. The checks run inside a burn-down. Ordinary sessions still mostly close only their own lines, and we have not measured how many items go stale between passes.
Add a revalidate step to your own agent backlog
The pattern carries to any team where more than one agent writes to a shared backlog, whether that is a markdown file, an issue tracker or a project board. Make an item name what would prove it done, make agents run that check before they start, and make "needs a person" its own status instead of a reason to leave a line open.
ZeroTwo's Code agent runs coding tasks locally, in a worktree or in the cloud from the desktop app, and the same habits apply there. For how we keep agents' worktrees accountable, read 96 dirty worktrees and nobody knew what was merged, and for the speed work in the current release, how we made a 16,000-step chat open fast.
If your agents can add work to a shared list, they also need a way to prove it is still there. Without that check, the list stops showing what is left and only shows what was ever written down.
Footnotes
- From the instructions every agent session loads for the shared to-do list, as read on November 26, 2026. They name the file, the script that locks it, and the rule to close every item your work completed, whichever thread added it. ↩
- From our agent notes written on November 11, 2026 and updated on November 22. The notes record 583 open to-dos and 622 open noticed items that day, and that the November 11 pass, run by thirteen workers over about 300 items, closed 171 items plus 4 deploy steps already live. ↩
- From our burn-down reports of November 21 and November 22, 2026. Both runs used builder agents on Sonnet 5.5, each in its own worktree, a reviewer per package, and one integrator merging packages locally. Items left out of the table were skipped for lack of data, blocked, or fixed but waiting in a blocked worktree. ↩
- From the November 22, 2026 burn-down report's run note. The sizes are measured per worktree on that machine. ↩
- Counted on November 26, 2026 at 07:38 Pacific time by counting unchecked and checked lines in the two list files. The November 17 figures come from our agent notes of that day. Closed items stay in the files, 1,837 to-dos and 1,010 noticed so far. ↩